Title
|
|
|
|
Staggered-level designs for experiments with more than one hard-to-change factor
|
|
Author
|
|
|
|
|
|
Abstract
|
|
|
|
In many industrial experiments, some of the factors are not independently set for each run. This is due to time and/or cost constraints and to the hard-to-change nature of the levels of these factors. Most of the literature restricts attention to split-plot designs in which all the hard-to-change factors are independently reset at the same points in time. This constraint is to some extent relaxed in split-split-plot designs because these allow the less hard-to-change factors to be reset more often than the most hard-to-change factors. A key feature of the split-split-plot designs, however, is that the less hard-to-change factors are reset whenever the most hard-to-change factors are reset. In this article, we relax this constraint and present a new type of design, which allows the hard-to-change factor levels to be reset at entirely different points in time. We show that the new designs are cost-efficient and that they outperform split-plot and split-split-plot designs in terms of the D- and A-optimality criteria. Because of the fact that the hard-to-change factors are independently reset alternatingly, we name the new designs staggered-level designs. Supplementary materials for this article are available online. |
|
|
Language
|
|
|
|
English
|
|
Source (journal)
|
|
|
|
Technometrics : a journal of statistics for the physical, chemical, and engineering sciences. - Washington, D.C., 1959, currens
|
|
Publication
|
|
|
|
Washington, D.C.
:
2012
|
|
ISSN
|
|
|
|
0040-1706
[print]
1537-2723
[online]
|
|
DOI
|
|
|
|
10.1080/00401706.2012.715834
|
|
Volume/pages
|
|
|
|
54
:4
(2012)
, p. 355-366
|
|
ISI
|
|
|
|
000312054000004
|
|
Full text (Publisher's DOI)
|
|
|
|
|
|
Full text (publisher's version - intranet only)
|
|
|
|
|
|